
Manufacturing, Design & Installation
Survey, design, in-house fabrication and on-site installation under one contract, with one point of contact.
Types of Manufacture & Installation

We come to the frontage and record dimensions, electrical supply and installation access. Free within Samsun. Alongside dimensions we record the power point, the façade material and whether an access vehicle can reach it.
Selected type
On-Site Survey and Measurement
Highlights
Free and non-binding
No surprise costs later
Accurate measurements mean a smooth install
Technical Specification
| Scope | Façade measurements, structure and power check |
|---|---|
| Equipment | Laser measure, photos; drone if needed |
| Outcome | A measured draft and a firm price |
| Timeline | Within 1–2 days in Samsun |
Before you decide
Visits outside the city are scheduled on a route; agree the date in advance.
About Manufacturing, Design & Installation
Royal Reklam handles survey, design, fabrication and installation entirely with its own team. Signage and façade work produced at our Samsun workshop is installed across Türkiye by our own crews, giving clients a single contract and a single point of contact, with responsibility never split across subcontractors.
The most common failure in signage is divided responsibility: design from one supplier, fabrication from another, installation from a third — and nobody owns the problem when something goes wrong. Royal Reklam brings that chain under one roof.
We start with a survey — measuring the façade on site, noting the electrical supply, access for installation and any municipal or mall restrictions. After design approval, fabrication happens in our own workshop, which is why we can commit to a delivery date without depending on a subcontractor.
Our installation crews travel beyond Samsun. For brands opening branches across Türkiye, holding an identical standard at every site is the capability clients value most.
What Determines the Price?
- Scope of works and total area
- Location and distance (travel and accommodation outside Samsun)
- Access method: cherry picker, scaffold or crane
- Infrastructure gaps identified at survey (power runs, strengthening)
- Number of sites — unit cost falls on multi-site programmes
- Extent of permit and documentation support
Common questions
Our Services
10+Day DeliverySignageIlluminated and non-illuminated shopfront signs: composite cabinets, acrylic, vinyl, blind-box and projecting signs.Read more
12+Day DeliveryChannel Letter SignsIndividually fabricated three-dimensional letters with front-lit, halo or dual illumination.Read more
20+Day DeliveryTotem & Pylon SignsFree-standing double-sided illuminated pylon signs for roadsides, forecourts and entrances.Read more








