Skip to content
Façade Cladding

Façade Cladding

Aluminium composite panel and mesh vinyl cladding that turns a building into brand surface.

Types of Façade Cladding

  • Aluminium Composite (ACP) Cladding

    4 mm composite panels that bring a whole building into the corporate colour — the primary façade method. It goes over a tired existing façade without stripping it, so the building looks wholly new in a short time.

Selected type

Aluminium Composite (ACP) Cladding

Highlights

  • Wide choice of colours, wood and metal finishes

  • Light, perfectly flat surface

  • A whole façade in the same language as the sign

Technical Specification

Aluminium Composite (ACP) Cladding
Material4 mm aluminium composite panel
SubstructureAluminium substructure
DurabilityPVDF coating; fire-retardant (FR) core option
Typical lifespan15–20 years

Before you decide

On multi-storey buildings fire regulations require FR-core panels.

About Façade Cladding

Façade cladding covers a building's exterior with aluminium composite panel, mesh vinyl or acrylic surfaces to turn it into brand identity. Royal Reklam delivers turnkey façade cladding in Samsun including survey, structural assessment, sub-frame and installation. Typical programmes run 1–4 weeks depending on area.

Façade cladding is the largest-scale work in signage. A tired exterior can become your strongest advertising surface within weeks, given the right material and the right sub-structure.

Aluminium composite panel (ACP) is the most common solution — light, formable and durable. On buildings that fall under fire regulations we specify A2 mineral-filled panel; this is a responsibility we do not treat lightly.

For buildings under construction and temporary campaigns, mesh (perforated) vinyl is preferred. It lets wind through, reducing load on the structure while still reading as a solid image from a distance.

What Determines the Price?

  • Façade area and geometric complexity
  • Panel class — A2 fire-rated panel costs more than standard
  • Sub-frame quantity and condition of the existing wall
  • Height and access method
  • Detailing around windows, corners and sills
  • Whether existing cladding must be stripped first

Common questions

A small shopfront takes 3–5 days. A multi-storey façade including sub-frame and scaffold can run 2–4 weeks. The exact programme is confirmed after survey.